Replacement SCADA Systems
Industry
Water and Waste
Water and Waste
Project Starting Date01/11/2018
End UserGeorgetown County Water and Sewer District
PROJECT DESCRIPTION
SCADA System Replacement:
We designed and supplied a replacement SCADA system, transitioning from Fix to VT SCADA. This comprehensive upgrade encompassed various components, including the replacement of seven chemical pump control panels, upgrades to the finished water pump station, and the addition of new filter level controls to enhance system functionality.
Services Rendered:
- Installation of the new VTSCADA platform.
- Integration of new PLCs for interface.
- Implementation of new conduit and wiring.
- Network installation of level transmitters.
- Network integration.
- Commissioning and successful start-up of the entire upgraded system.