
GRAA Soccer Park Pump Control System
Agriculture
Project Starting Date01/07/2023
End UserDAmore Enterprises, Inc.
PROJECT DESCRIPTION
The project encompassed the successful refurbishment of an irrigation control system that catered to a network of 14 soccer fields. The discreet execution included:
Enhanced Pump Control System:
We improved the existing pump control system with cutting-edge SCADA integration, PLC, VFD, and the integration of essential components such as relays, pilot lights, terminals, wire ducts, and wire accessories.
Enclosure Upgradation:
The existing starter, overload, and breaker enclosure were meticulously replaced with a new, robust enclosure, ensuring heightened safety and operational efficiency.
This project optimally redefined irrigation management for the soccer fields, with all work completed in a subtle, seamless manner.