East End Shops Lift Station Upgrade

Industry
Transportation

Project Starting Date01/07/2021

End UserNorfolk Southern Corporation.

PROJECT DESCRIPTION

Modification of Existing Controls:

We supplied all the labor, materials, and resources required to modify the existing control system. This modification included the addition of one PLC system, one Human Machine Interface (HMI), one hydrostatic level transmitter, and one Uninterruptible Power Supply (UPS) with batteries.

Past Accomplishments:

The project involved the following tasks:

  • Programmed and factory-verified the PLC and HMI.
  • Mounted the UPS in a new enclosure and conducted factory testing.
  • Removed unused level floats.
  • Installed the new hydrostatic level transmitter.
  • Installed the PLC, HMI, power supply, and UPS enclosure.