Chemical Control Panel Replacements
Industry
Water and Waste
Water and Waste
Project Starting Date01/01/2020
End UserGeorgetown County Water and Sewer District
PROJECT DESCRIPTION
Panel Assembly Design and Fabrication:
We designed, fabricated, and conducted factory testing for a new panel assembly equipped with Allen Bradley PLCs and Automation Control DC drives.
Services Rendered:
- Termination of field and panel wiring.
- System commissioning.
- Factory acceptance testing for the panel assembly.
- Panel installation, wiring, and terminations, including I/O and loop checkout.
- Control system start-up and final testing.
- Comprehensive documentation upon project completion.