Chemical Control Panel Replacements

Industry
Water and Waste

Project Starting Date01/01/2020

End UserGeorgetown County Water and Sewer District

PROJECT DESCRIPTION

Panel Assembly Design and Fabrication:

We designed, fabricated, and conducted factory testing for a new panel assembly equipped with Allen Bradley PLCs and Automation Control DC drives.

Services Rendered:

  • Termination of field and panel wiring.
  • System commissioning.
  • Factory acceptance testing for the panel assembly.
  • Panel installation, wiring, and terminations, including I/O and loop checkout.
  • Control system start-up and final testing.
  • Comprehensive documentation upon project completion.